Skip to content

Wave D Closeout

Wave Closeout

  • Wave: Wave D
  • Status: completed (prepared + deferred)
  • Date: 2026-03-09
  • Owner: Arqon (irbsurfer)
  • Objective: establish ownership and migration safety controls for external infrastructure without forcing premature cutover.

Scope Completed

  • finalized external ownership inventory
  • assigned single accountable owner for all external infrastructure surfaces
  • published readiness checklist for D2 live migration
  • aligned modernization matrix, decision log, and gotcha registry

Files Added

Files Updated

Breaking Changes Introduced

  • none

Compatibility Shims Added

  • none

Verification Performed

  • ownership matrix and responsibility assignments reviewed
  • readiness gate criteria reviewed
  • docs build validation: mkdocs build

Residual Risks

  • external runtime/update ownership remains inherited until D2
  • availability and policy changes on inherited infrastructure remain outside Arqon control

Rollback Point

  • no runtime cutover was performed; rollback is not applicable

Entry Criteria For Next Step

D2 starts only when all of these are true:

  1. Arqon-owned endpoints and artifact hosts are live
  2. readiness checklist is fully green
  3. explicit cutover window is approved