Wave D Readiness Checklist (D1 Gate)

Use this checklist before starting any live infrastructure cutover.

Phase Gate

  • D1 inventory completed: wave-d-ownership-inventory.md
  • Every active external surface has an assigned owner
  • All unknown ownership entries resolved

Technical Prerequisites

  • Arqon-owned streaming hostname(s) created
  • Arqon-owned update/artifact hostname(s) created
  • TLS certificates provisioned for all new hostnames
  • Health endpoint(s) defined and reachable for replacement services
  • Artifact hosting supports versioned release files
  • Integrity model defined (sha256, signatures, or equivalent)

Runtime Safety Controls

  • Endpoint selection is config-driven (no hardcoded cutover)
  • Legacy endpoint fallback behavior explicitly defined
  • Rollback switch exists and is documented
  • Smoke test scripts can validate both runtime and update path

Operational Readiness

  • DNS change process and owner documented
  • Certificate renewal responsibility documented
  • Incident contact + escalation path documented
  • Monitoring/alerting plan documented
  • Change window and rollback window defined

Documentation Readiness

  • User-facing docs do not claim Arqon endpoints that do not exist
  • Decision log updated for Wave D migration policy
  • Gotcha registry updated with new external infra traps

Go/No-Go Rule

If any item above is unchecked, Wave D remains in D1 preparation mode and no live cutover should be attempted.

Current Program Decision

Wave D is hard-closed as prepared + deferred:

  • governance and ownership mapping are complete
  • live migration is intentionally postponed