Skip to content

Wave E Closeout

Wave Closeout

  • Wave: Wave E
  • Status: completed (hard-close)
  • Date: 2026-03-09
  • Owner: Arqon (irbsurfer)
  • Objective: separate active product messaging from historical/provenance materials while preserving legal and historical accuracy.

Scope Completed

  • published Wave E scope and E1 classification inventory
  • rewrote active engine docs to Arqon Maestro language
  • rewrote active web product pages/metadata in Arqon framing
  • added explicit provenance notice surfaces for blog/legal content
  • published evidence and updated modernization tracking

Breaking Changes Introduced

  • none in runtime behavior; documentation and website content only

Compatibility Shims Added

  • provenance banner component for historical/legal material

Compatibility Shims Removed

  • none

Verification Performed

  • mkdocs build

Residual Risks

  • historical blog/legal bodies still include inherited naming by design (annotated provenance)
  • inherited CDN media/download endpoints remain an external dependency and are deferred to Wave D2

Rollback Point

  • this wave affects docs/web content only; git rollback is straightforward if needed

Next Wave Handoff

  • Wave F can proceed with data-plane modernization planning and implementation once Wave E docs are merged and published.