Wave E Closeout¶
Wave Closeout¶
- Wave:
Wave E - Status:
completed (hard-close) - Date:
2026-03-09 - Owner:
Arqon (irbsurfer) - Objective: separate active product messaging from historical/provenance materials while preserving legal and historical accuracy.
Scope Completed¶
- published Wave E scope and E1 classification inventory
- rewrote active engine docs to Arqon Maestro language
- rewrote active web product pages/metadata in Arqon framing
- added explicit provenance notice surfaces for blog/legal content
- published evidence and updated modernization tracking
Breaking Changes Introduced¶
- none in runtime behavior; documentation and website content only
Compatibility Shims Added¶
- provenance banner component for historical/legal material
Compatibility Shims Removed¶
- none
Verification Performed¶
mkdocs build
Residual Risks¶
- historical blog/legal bodies still include inherited naming by design (annotated provenance)
- inherited CDN media/download endpoints remain an external dependency and are deferred to Wave D2
Rollback Point¶
- this wave affects docs/web content only; git rollback is straightforward if needed
Next Wave Handoff¶
- Wave F can proceed with data-plane modernization planning and implementation once Wave E docs are merged and published.